Projects

Engineering in the field: delivered projects and projects in development

In Niğde, monthly electricity consumption fell by 36% for the same volume of water. The project cards show the current stage of the Giresun and Kabul studies.

Pumping station in Niğde after rehabilitation: new blue pump sets and neatly arranged pipework

Three projects, three different stages

We keep a documented project, a study in contract negotiations and a study at proposal stage clearly apart.

  • Pumping station in Niğde after rehabilitation

    Delivered project · 2021

    Niğde: connected water infrastructure

    Field modernisation and remote management bringing well, pumping station and reservoir facilities together in a shared operating structure.

  • Illustrative image: a water pumping building and reservoir on a hillside on the Black Sea coast

    Contract negotiations ongoing

    Giresun: pump rehabilitation proposal

    Pump and motor measurements and the feasibility study are complete; contract negotiations are ongoing. This is not a completed project or a verified savings result.

  • Illustrative image: an arid river valley surrounded by snowy mountains, with a water reservoir on the hillside

    Proposal study · June 2025

    Kabul: integrated water management proposal

    A proposal ranging from water resource assessment and infrastructure modernisation to remote operation and local knowledge transfer.

References: completed projects and earlier collaborations

Deliveries from engineering design to site installation and commissioning, and experience gained through partnerships and collaborations before the current corporate structure.

Completed industrial projects

We completed all four projects and handed them over to our clients. Quantified energy savings are not stated in these reference records.

  • Ahlatçı Holding

    Turnkey · commissioned and handed over in 2024

    Industrial water infrastructure at a gunpowder plant. While the plant was being built, we analysed the water needs of the process and auxiliary facilities and prepared the engineering design; we then installed the mechanical water infrastructure, electrical and control panels, PLC-based automation and central SCADA. Water supply now runs automatically and continuously, with pressure, flow and level monitored in real time. Routine manual checks are no longer needed and operating risks from human error have been reduced.

  • EÜAŞ thermal power plant, Kahramanmaraş

    Completed and handed over · 2018

    We integrated 25 pump control systems at the plant and installed central SCADA. We applied autonomous control and energy optimisation to the boiler feedwater and auxiliary process pump sets, so the different pump sets can be managed from one central control infrastructure.

  • Varaka Kâğıt paper mill, Balıkesir

    Completed and handed over · 2022

    We rehabilitated the deep-well, transfer and fire-water pumps and connected them to automation and a central SCADA system, supporting reliable, continuous management of process water in intensive industrial production.

  • Türkşeker, Erzurum

    Completed and handed over · 2022

    We installed control systems for the water lines and deep-well pumps in the beet processing operation and integrated the field equipment into central SCADA, so the process water infrastructure is monitored and controlled as one.

Earlier partnerships and collaborations: water infrastructure and industry

These projects represent engineering and delivery experience gained through partnerships and collaborations before the current corporate structure.

  • Kayseri KASKİ

    Water infrastructure

    PLC automation, field measurement, secure wireless communication and central SCADA for drinking-water pumping, booster and storage infrastructure. Control based on reservoir level and network pressure improved energy use and response processes. The system is operated by the public utility.

  • Konya KOSKİ

    Water infrastructure

    Pumping and booster stations on a large drinking-water network were automated and connected to central SCADA. The project was completed and handed over.

  • Hacıbektaş Municipality

    Water infrastructure · around 2011

    Pump systems were modernised with variable-frequency drives (VFDs) and automation panels. The initial 50% target was exceeded; the reference record reports 55% energy savings.

  • Şarkışla Municipality

    Water infrastructure

    Reservoir level monitoring, well pump control and autonomous chlorine dosing were installed; reservoir fill and chlorination parameters can be managed remotely.

  • ORTA, Orta Anadolu Mensucat, Kayseri

    Industry and automation

    Industrial process water distribution, variable-frequency drives, control panels and pump automation. The system supports controlled flow and pressure and continuous production in water-intensive denim manufacturing.

  • Erciyes Anadolu Holding: Boyçelik and Boyteks

    Industry and automation

    Variable-frequency drives and automation were applied to boiler feedwater pumps and cooling tower circulation pumps. Pressure fluctuations were eliminated, process conditions on the metal and textile lines stabilised and the risk of unplanned downtime reduced.

  • Merzifon Municipality

    Water infrastructure

    Multi-well and reservoir synchronisation, reservoir chlorination, residual chlorine monitoring and SCADA integration were installed. Wells and reservoirs work in coordination and pressure on the transmission line is balanced.

  • Yozgat Municipality

    Water infrastructure

    Drinking-water pumping stations, drives and control panels were automated. Well, pump and reservoir data were brought together in central SCADA, reducing the need for manual intervention.

Development portfolio: not yet completed references

The studies below are at feasibility, contract or proposal stage. They are not presented as completed projects or verified savings results. Giresun and Kabul appear in the cards above.

  • Feasibility complete · contract negotiations ongoing

    Sivas: large-scale thermal power plant

    Measurement, baseline analysis and technical feasibility for the boiler feedwater pumps are complete. The proposal covers mechanical and hydraulic rehabilitation and integration with central industrial SCADA. The feasibility study targets a 42.1% net improvement in energy efficiency and proposes 15-year performance sharing.

  • Project development

    Eren Holding: thermal power plant infrastructure

    A project is being developed for pump systems, energy-efficiency upgrades, automation and long-term performance management. The technical scope, investment model, financing structure and performance targets are being defined.

  • Engineering complete · technical and commercial proposal

    Bahrain: water transmission networks

    Energy, flow and pressure measurements on the transmission networks and pumping stations are complete. The proposal covers Metirius control panels, central network monitoring and autonomous field control. Long-term investment and savings-sharing options are being evaluated.

Our areas of work

Water management, energy efficiency and automation projects.

  • Engineering

    Automation and design projects

    Test infrastructure for critical systems, industrial automation and project-specific software.

  • Water cycle

    Water management

    Technology across every stage of the water cycle for municipalities, irrigation cooperatives and agriculture.

  • Pump and motor systems

    Energy efficiency

    Measurement, analysis and turnkey improvements for pump, motor and water systems.

Let’s clarify together what stage your project is at.

Share your current measurements and targets, and we will plan the measurement, feasibility and implementation scope together.